Does my home meet the requirements for dilapidated old house reconstruction? 3 dilapidated old house conditions, 5 old house reconstruction application processes, 4 dilapidated old house reconstruction rewards, take you to quickly understand the dilapidated old house reconstruction assessment

When facing the old house at home, have you ever thought: "Can this old house of mine be renovated?"Apply for reconstruction of dilapidated old buildings? "、"I heardThere are many incentives for rebuilding dilapidated and old buildings, but the conditions seem complicated?"These questions are believed to be common concerns in the minds of many homeowners.
As Taiwan's aging housing problem becomes increasingly serious, the government's policy of rebuilding dilapidated homes has indeed brought new hope to many elderly homeowners. However, how to determine whether their home meets the requirements and how to apply are often confusing.
This article will provide you with a complete analysis of all the key information on the reconstruction of dilapidated old buildings. Whether you are new to dilapidated old buildings reconstruction or are considering whether to apply, this article can provide you with practical guidance!

文章作者

What is a dangerous old building? Understand the definition of dangerous old buildings in one minute

Dangerous old buildings, officially known asDangerous and old buildings"Renovation" refers to buildings that need to be rebuilt or repaired because of concerns about their structural safety or their age.
according to"Ordinance on Accelerated Redevelopment of Dangerous and Old Urban BuildingsAccording to the regulations of the Ministry of Housing and Urban-Rural Development, dilapidated and old buildings are mainly divided into two categories:

⠀⠀⠀⠀

1. Dangerous Buildings

This refers to buildings whose structures or equipment have safety concerns and have been notified by the building authority in accordance with the Building Act to repair, reinforce or demolish them within a specified period of time. Such buildings usually pose a direct threat to residential safety due to factors such as "structural damage", "unstable foundations" or "aging building materials". The building authority will conduct a professional assessment and confirm that the building does indeed pose a safety risk before issuing relevant notifications.

⠀⠀⠀⠀

2. Old Buildings

Old buildings refer to buildings that are more than 30 years old.Structural safety performance assessmentThose whose results do not reach the lowest level; or those whose houses are more than 30 years old, whose earthquake resistance does not meet certain standards, and whose improvements are ineffective or have no lifting equipment installed. This definition covers most of the old residential buildings in Taipei City and provides a legal basis for the reconstruction of these buildings.

⠀⠀⠀⠀

Definition of Dangerous and Old Buildings: Key Points on Dangerous and Old Buildings

The definition of the above legal provisions is summarized here for you!

⠀⠀⠀⠀

 Dangerous buildingsOld buildings
Building characteristics
  • Structural damage to buildings
  • Unstable building foundation
  • Aging of building materials
  • through Structural safety performance assessment Those whose results do not reach the minimum level
  • Houses over 30 years old
  • Earthquake resistance does not meet certain standards
  • Improvement of inefficient or no lifting equipment
example
  • Sea sand house.
  • Earthquake damaged house.
  • Apartments and townhouses that are over 30 years old and do not have elevators.
  • The building is over 30 years old and has the earthquake resistance level of a Class B elevator building.
How to deal with it?The competent building authority shall notify the relevant authorities of the deadline for repair, reinforcement or demolition in accordance with the provisions of the Building Act.Apply to the local government for reconstruction of old houses on your own.

⠀⠀⠀⠀

It is particularly important to note that buildings applying for reconstruction of dilapidated buildings must also meet other conditions, including: the building and its base must comply with building laws and regulations, have not been expropriated by the government or by sections, and the base area must comply with the minimum unit restrictions.

⠀⠀⠀⠀

Which buildings are actually unable to apply for dilapidated reconstruction?

The answer is here! Ancient monuments, historical buildings, and buildings with artistic and commemorative value are actually not eligible to apply for dilapidated reconstruction!
Therefore, if your old house meets the standards of a historical monument, you cannot apply for reconstruction of dilapidated buildings. In fact, these buildings should go through the process of urban renewal!

⠀⠀⠀⠀

Does my family qualify? 3 quick tests for critically ill elderly people

To determine whether your home qualifies for dilapidated reconstruction, you can conduct a preliminary assessment based on the following three key criteria:

⠀⠀⠀⠀

Condition 1: House age condition

First, check the age of your home. According to the Dangerous Reconstruction Ordinance, the building must meet any of the following conditions:

  1. Legal buildings over 30 years old
  2. A building that has been identified as a dangerous building by relevant professional technicians of a joint supply contract organization designated by the central competent authority
  3. Buildings identified as insufficiently earthquake-resistant

⠀⠀⠀⠀

Things to note when checking the age of a house:

Most applications are based on the requirement of "house age over 30 years". You can check your home's building license or use license to confirm the actual year of completion. It is important to note that the "30 years" here is based on the date the building obtained the use license, not the "time of purchase of the house".

⠀⠀⠀⠀

Condition 2: Legality

The building must be a "legal building", specifically it must meet one of the following conditions:

  1. A legal building with a building license and a use license. If you do not have one, you need to apply to the local government first.
  2. Existing legal buildings that existed before the implementation of building management
  3. Buildings that have applied for and obtained building permits through legal procedures

⠀⠀⠀⠀

Special circumstances:

If your home is an illegal building, or if parts of it are built or added without obtaining relevant permits, it cannot be included in the scope of dangerous and old reconstruction. However, if the main structure of the building is legal and only part of it is illegal, you can usually apply for dangerous and old reconstruction for the legal part.

⠀⠀⠀⠀

Condition 3: Completeness Condition

Applications for the reconstruction of dilapidated and old buildings are made on a "building site" basis. If it is a townhouse or a single-family building, it is usually easier to meet the requirements. If it is an apartment or a building, the consent of all owners of the building is required. If there are multiple buildings on the site, in principle, they need to apply together. This condition is often the most challenging part of the application process.
Especially in old apartments, it is not easy to obtain the consent of all residents, which requires sufficient communication, coordination and professional assistance.

⠀⠀⠀⠀

Want to apply for dilapidated old building reconstruction? The assessment process for dilapidated old building reconstruction is now open.

⠀⠀⠀⠀

After understanding whether your home qualifies, the next step is the actual application process for the dilapidated reconstruction assessment. The entire process can be divided into five main stages:

⠀⠀⠀⠀

Phase 1: Initial Assessment and Consultation

Before formally applying, it is recommended to conduct a preliminary assessment. This stage mainly determines the basic conditions of the building, including its age, legality, and the owner's wishes.

⠀⠀⠀⠀

What you need to do are:

  • Collect relevant documents supporting the building (construction license, occupancy license, land and building registration transcripts, etc.)
  • Consult a professional architect or technician to find out if the building meets the application requirements
  • If it is a collective housing, start communicating with other residents to understand their willingness to rebuild.

This stage usually takes 1 to 2 months and mainly involves collecting information and conducting preliminary communication.

⠀⠀⠀⠀

Phase 2: Professional Identification and Evaluation

After you decide to apply, you needCommission a qualified architect, civil technicians or structural technicians for professional appraisal.

⠀⠀⠀⠀

The identification you need to apply for includes:

  • Building structural safety assessment
  • Detailed evaluation of earthquake resistance (preliminary evaluation, detailed evaluation)
  • Building Condition Survey
  • Reconstruction feasibility analysis

⠀⠀⠀⠀

Professional appraisal is the core of the entire application process. The quality of the appraisal report directly affects the success rate of the application. This stage usually takes 2 to 3 months and costs about 100,000 to 300,000 yuan, depending on the scale of the building. At the same time, you can also apply for partial government subsidies for the appraisal costs.

⠀⠀⠀⠀

Phase 3: Reconstruction Plan Development

After obtaining the professional appraisal report, a detailed reconstruction plan should be drawn up.

⠀⠀⠀⠀

The reconstruction plan includes:

  • Reconstruction scope and scale planning
  • Architectural design concept
  • Project budget estimate
  • Construction schedule planning
  • Resident Resettlement Plan

The reconstruction plan needs to take into account the needs and opinions of all residents and comply with relevant regulations. This stage takes approximately 3 to 4 months.

⠀⠀⠀⠀

Stage 4: Application and Review

After completing the reconstruction plan, you can formally submit an application to the local government for the reconstruction of dilapidated and old buildings.

⠀⠀⠀⠀

Required application documents include:

  • Application for reconstruction of dilapidated old buildings
  • Building safety appraisal report
  • Reconstruction Plan
  • Land and building rights certification documents
  • Consent from all owners

⠀⠀⠀⠀

The government agency will conduct a written review and on-site inspection, which usually takes 1-2 months. If the documents are complete and meet the requirements, a reconstruction permit will be issued.

⠀⠀⠀⠀

Phase 5: Implementation and Supervision

Once you have a reconstruction permit, you can begin the actual reconstruction work.

⠀⠀⠀⠀

This phase includes:

  • Apply for a building license
  • Carry out demolition work
  • New construction project
  • Apply for a license

⠀⠀⠀⠀

The entire project usually takes 1.5 to 2 years, depending on the size and complexity of the building. During this period, it is also necessary to cooperate with various government inspections and supervision. The entire dangerous and old reconstruction assessment process from start to finish usually takes 3-4 years. Although the process is relatively complicated,With the help of a professional team, which can greatly simplify the procedure and improve the success rate.

⠀⠀⠀⠀

Summary of the four major preferential policies for the elderly in critical condition

⠀⠀⠀⠀

1. Volume Rewards

The maximum reward is 1.3 times the base volume or 1.15 times the original building volume.

⠀⠀⠀⠀

2. Tax Incentives

Land tax is exempted during the reconstruction period; after completion, land tax is halved for 2 years; property tax is halved for up to 10 years (untransferred).

⠀⠀⠀⠀

III. Loan Preferential Treatment

Not subject to loan financing ratio restrictions under the Banking Act.

⠀⠀⠀⠀

IV. Loan Interest Subsidy

The application period ends on December 31, 2015. The maximum loan amount per household is NT$3.5 million. The preferential interest rate is calculated based on the Chunghwa Post Co., Ltd.'s two-year fixed deposit interest rate for deposits less than NT$5 million, minus 0.533%. When the Postal Savings Bank's interest rate is adjusted, the interest rate will be adjusted accordingly. Starting from the fourth year, the preferential interest rate and interest subsidy will be discontinued, and the borrower (i.e., the recipient of the subsidy) will renegotiate the interest rate with the lending financial institution.

⠀⠀⠀⠀

Rebuilding an old house is easy! Experts guide you through the process

Many people are hesitant to rebuild their old homes, mainly because they think the process is complicated and time-consuming. However, with proper planning and professional assistance, house reconstruction can become relatively simple and smooth.
According to the "Act on Accelerated Reconstruction of Dangerous and Old Urban Buildings," there is actually an application deadline for the reconstruction of dangerous and old buildings. Applications can only be made within a 10-year period, from May 10, 2017, to May 31, 2017.

  1. Applications for the reconstruction project will be accepted until May 31, 2017.
  2. Applications for tax exemptions and reductions are open until May 11, 2017.

When application time is limited, you can enlist the help of a professional team. The homeowner only needs to provide the necessary documents and make decisions. Other complex technical work can be handled by experts, which can save the homeowner a lot of time and complete the application within the deadline.

⠀⠀⠀⠀

Who can you turn to for professional reconstruction of dilapidated old houses? B-studio's professional team of architects and years of experience will help you avoid unnecessary mistakes when renovating old houses.

B-studio's team of architects has been deeply engaged in the reconstruction of dilapidated and old buildings for many years and has handled a variety of cases, from single-family houses to large-scale collective housing, from simple structural reinforcement to complete reconstruction. We have rich experience in handling this and can provide the most suitable solutions.

⠀⠀⠀⠀

B-studio service features include:One-stop integrated service, from the initialFeasibility assessment, professional appraisal, reconstruction plan formulation, and subsequent construction supervision and license applicationB-studio can provide complete consulting services, so you don’t have to run around looking for different manufacturers. Professional and careful assessment, considering the surrounding environment, regulatory restrictions, and the actual needs of the homeowner, to provide the most realistic assessment report.Homeowners are welcome to consult, quickly complete the subsidy application before June 2017!

⠀⠀⠀⠀

Combining government resources with local experience, the reconstruction of dilapidated old houses is no longer a complex and difficult project, but a proposal for future living that can be properly planned.Subscribe to our YouTube channel, or joinOur official LINE account, A Ben will work with you to complete the application process for the elderly at risk.

B-Studio Architectural Design Cases

清水模老屋重建案例:外層設計米粒造型孔洞

[2025 Latest Taipei City Elderly Care Incentives] 3-Minute Guide: Everything from floor area incentives, building certification subsidies, and tax incentives included!

The proportion of old houses in Taipei City accounts for 72%, and the number of old houses over 30 years old is as high as 640,000.Statistical Bulletin of the Ministry of the Interior and Statistics Department for the 40th week of 2011Taipei City has the highest proportion of buildings over 40 years old at 47.51%. If we further examine the proportion of buildings over 30 years old, Taipei City takes the lead in Taiwan at 71.98%. The urban renewal plan has become an inevitable reform for Taipei City. If citizens want to rebuild dangerous old buildings on their own, they can actually apply for the Taipei City Dangerous and Old Building Incentive.

If you also want to know how to calculate the Taipei City Elderly Care Incentive, then don’t miss the quick guide B-Studio has prepared for you, which will help you quickly understand how to calculate and apply for the incentive!

文章作者

Definition of dilapidated buildings: What kind of buildings can be called "dilapidated"?

Dangerous old age is based onOrdinance on Accelerated Redevelopment of Dangerous and Old Urban Buildings"Regulations on Dangerous and Old Buildings", Article 3 of which stipulates that dangerous and old buildings are mainly divided into two types: dangerous buildings and old buildings.

⠀⠀⠀⠀

1. Dangerous Buildings

This refers to buildings whose structures or equipment have safety concerns and have been notified by the building authority in accordance with the Building Act to repair, reinforce or demolish them within a specified period of time. Such buildings usually pose a direct threat to residential safety due to factors such as "structural damage", "unstable foundations" or "aging building materials". The building authority will conduct a professional assessment and confirm that the building does indeed pose a safety risk before issuing relevant notifications.

⠀⠀⠀⠀

2. Old Buildings

Old buildings refer to buildings that are more than 30 years old.Structural safety performance assessmentThose whose results do not reach the lowest level; or those whose houses are more than 30 years old, whose earthquake resistance does not meet certain standards, and whose improvements are ineffective or have no lifting equipment installed. This definition covers most of the old residential buildings in Taipei City and provides a legal basis for the reconstruction of these buildings.

⠀⠀⠀⠀

Definition of Dangerous and Old Buildings: Key Points on Dangerous and Old Buildings

The definition of the above legal provisions is summarized here for you!

⠀⠀⠀⠀

 Dangerous buildingsOld buildings
Building characteristics
  • Structural damage to buildings
  • Unstable building foundation
  • Aging of building materials
  • through Structural safety performance assessment Those whose results do not reach the minimum level
  • Houses over 30 years old
  • Earthquake resistance does not meet certain standards
  • Improvement of inefficient or no lifting equipment
example
  • Sea sand house.
  • Earthquake damaged house.
  • Apartments and townhouses that are over 30 years old and do not have elevators.
  • The building is over 30 years old and has the earthquake resistance level of a Class B elevator building.
How to deal with it?The competent building authority shall notify the relevant authorities of the deadline for repair, reinforcement or demolition in accordance with the provisions of the Building Act.Apply to the local government for reconstruction of old houses on your own.

⠀⠀⠀⠀

Application Flowchart for Dangerous and Old Redevelopment and Additional Application Conditions

⠀⠀⠀⠀

If you also want to apply for dilapidated reconstruction, you should know that the building must meet other conditions. These include:

  1. The building and its base must comply with the provisions of the Building Act and not be expropriated by the government or the district.
  2. The site area must comply with minimum unit restrictions, etc.

⠀⠀⠀⠀

In addition, applicants need to provide complete supporting documents, including building ownership certificate, use license, structural safety performance assessment report and other relevant information. If you think it is too troublesome to organize these materials, you can also askProfessional dangerous and old building team to help you answer.

⠀⠀⠀⠀

Taipei City Elderly Care Query

Taipei City currently does not have a "Dangerous and Old Buildings Query System", but the Taipei City Government has established a completeUrban Renewal Analysis and Query System, and through a variety of inquiry channels, homeowners can easily confirm whether their buildings meet the conditions for urban renewal and reconstruction.

⠀⠀⠀⠀

In addition to online inquiries, the public can also obtain assistance through telephone consultation or counter services. The Taipei City Construction Management Office has a dedicated hotline where professionals provide consulting services to answer the public's various questions about the reconstruction of dilapidated old buildings. For cases that require detailed explanations, the public can also go to the construction management office in person to handle them. There are dedicated personnel on site to provide one-on-one consulting services. If you need to inquire online, you can also join the B-studio official LINE account, which will also haveDedicated online answersYour question about the reconstruction of dilapidated old buildings!

⠀⠀⠀⠀

Taipei City's Dangerous and Old Building Reward

⠀⠀⠀⠀

Taipei City's redevelopment of dilapidated and old buildings is not only a key government policy but also a crucial way to improve living quality and enhance urban safety. The Taipei City's volume incentive for dilapidated and old buildings is a key incentive for promoting the redevelopment of old buildings. By increasing building volume, it improves the economic benefits of redevelopment. Below, we also share two other incentives besides the volume incentive!

⠀⠀⠀⠀

Rewards for Dangerous and Old Buildings: 1. Volume Rewards

  1. The maximum is 1.3 times the base volume (legal volume) or 1.15 times the original volume of the building.
  2. If the site area is less than 200 square meters (about 60.5 pings) and the age of the adjacent buildings is less than 30 years, a volume bonus of 2% will also be given.
  3. Dangerous and old buildings: 6% ~ 10%
  4. Original volume is greater than reference volume: 10%
  5. Smart Building: 2% ~ 10%
  6. Setback Building: 8% ~ 10%
  7. Building seismic design: 2% ~ 10%
  8. Accessible environment: 3% ~ 5%
  9. Assist in obtaining development facilities: 5%
  10. Green Building Level: 2% ~ 10%
  11. Based on the above dangerous and old volume rewards, the total upper limit is 30% volume rewards.

⠀⠀⠀⠀

Rewards for Dangerous and Old Buildings II. Tax Rewards

  1. Land tax is exempted during the reconstruction period. However, if the reconstruction is not completed within the construction period and the fault is attributable to the land owner, land tax shall be levied in accordance with the law.
  2. After reconstruction, land tax and property tax will be halved for two years.
  3. If the legal owner of a building prior to reconstruction is a natural person and the owner of the reconstructed building has not transferred the property within the two-year period of the half-price property tax reduction as described in the preceding paragraph, the half-price property tax reduction period may be extended until the owner loses ownership, but this limit is ten years.

⠀⠀⠀⠀

Rewards for Dangerous and Old Buildings III. Cost Subsidy

⠀⠀⠀⠀

Subsidy ProjectsSubsidy amount (NTD)
Preliminary assessment of earthquake resistanceFor buildings with a total floor area of less than 3,000 m², the fee is NT$12,000 per building.
For buildings with a total floor area of 3,000 m² or more, 15,000 yuan per building
Assessment agency review fee: 1,000 yuan per building
Detailed assessment of earthquake resistanceNot more than 30% of the assessed cost or $400,000 per building.
Review agency review feesIf the preliminary assessment result does not reach the minimum level, and the applicant submits the certification document of approval by the review agency, NT$6,000 per building
A detailed assessment of earthquake resistance shall be conducted at a cost of 15% per building, but shall not exceed 200,000 yuan.
Reconstruction PlanA subsidy of NT$55,000 per case

⠀⠀⠀⠀

  1. The maximum value of the initial earthquake resistance assessment is 15,000, and the maximum value of the detailed assessment is 400,000.
  2. The reconstruction project provides a subsidy of 55,000.

⠀⠀⠀⠀

Taipei City Volume Bonus Calculator

according to"Measures for awarding construction volume of dangerous and old urban buildings"Organize it into the following table:

⠀⠀⠀⠀

台北市容積獎勵試算表

base volume

Land area * statutory plot ratio; assuming a plot of land has an area of 800 square meters and the land use zoning is Taipei City Residential District II (the plot ratio is usually 200%).

⠀⠀⠀⠀

👉 Then:

Base volume = 800 × 200% = 1,600 square meters

⠀⠀⠀⠀

Original building volume

"Original building volume" refers to the actual floor area of buildings that were legally constructed before the implementation of volume control, deduced based on current regulations.

When many old houses were built, the government did not have such strict restrictions on the floor area ratio, so the actual floor area built often exceeds the current statutory floor area ratio.
As long as these types of buildings are approved by the competent authorities and confirmed to be not being used illegally, they can apply for additional urban renewal or dilapidated building volume incentives during future reconstruction, ensuring that the new building volume will not be reduced compared to the original, and may even have the opportunity to be slightly larger. This system is mainly designed to prevent homeowners from "building smaller and smaller" during reconstruction due to changes in regulations, and further encourage the renovation of old communities to improve safety and quality of life.

⠀⠀⠀⠀

Taipei City's Dangerous and Old Building Redevelopment Zone: B-studio assists in promoting one-stop reconstruction and practical lectures

The Taipei City Dangerous and Old Building Reconstruction Zone is a one-stop platform established by the government to promote urban renewal and integrate policies and services. It provides important content including regulatory information, application procedures, policy announcements, volume incentive inquiries, etc., so that the public can quickly grasp the reconstruction context.

In addition to government platforms, B-studio, as a local reconstruction consulting team, has long been monitoring the trends in the reconstruction of dilapidated and elderly properties in Taipei City. They not only provide regulatory consultation and case evaluation, but also help residents clarify the process and understand their rights through lectures, community briefings, and seminars. B-studio also regularly tracks changes in regulations and incentives to help secure the best reconstruction opportunities. On a project-by-project basis, they accompany homeowners in evaluating whether to apply and uniting households to accelerate reconstruction efficiency.

Combining government resources with local experience, the reconstruction of dilapidated old houses is no longer a complex and difficult project, but a proposal for future living that can be properly planned.Subscribe to our YouTube channel, or joinOur official LINE account, A Ben will work with you to complete the application process for the elderly at risk.

清水模老屋重建案例:外層設計米粒造型孔洞

Is it cost-effective to buy land and build on your own? Understand whether buying land and building a house is cost-effective from the budget and process

Have you ever thought about whether it is cost-effective to buy land and build your own? Or have you ever heard stories of regrets about building your own home? If you want to tailor-make your dream house, but don’t know where to start or the process of buying land to build a house, or even wondering if it would be cheaper to build your own house? Then be sure to read this article to learn about the budget and process of self-building a home, so that you can have an idea of how much it costs to build a square meter on your own land, and also think about whether your home is suitable for self-construction.

 

Is it cheaper to build your own house? How much does it cost to build a square meter on your own land?

 

Price for buying land and building one yourself

  • 150,000/PingStarting from: The area around the self-built site is suitable for construction.
  • Starting from 170,000/square meter: Self-built land is difficult to construct due to various factors, such as neighboring houses in alleys.
  • Others: Taipei and New Taipei are urban areas with dense buildings, so indirect costs are relatively high, about 170,000 to 250,000 per square meter.

However, prices will vary depending on factors such as actual conditions, construction schedule, construction methods and material selection.

 

Factors affecting the cost of buying land and building a house

 

  • Construction methods and use of building materials:

For example, reinforced concrete (RC), steel reinforced concrete (SRC), and steel structure (SC). Different construction methods and the type and quality of building materials used will all affect the project cost.

 

  • Self-built location:

For example, if the construction site is located in an alley, construction will be difficult and the project cost will naturally increase.

 

  • Ease of construction based on the location of the house:

For example, uneven land and special terrain require large-scale infrastructure projects.

 

If you want to know more about the cost of self-building on your own land, you can refer to:How are construction costs estimated? Understand the cost of self-construction in 5 minutes

 

The flow of buying land and building a houseProcedure

Since buying land to build a house is self-building, it means that you have to choose the architectural design, interior decoration, and building materials by yourself, which will inevitably cost more time and cost in the process. Therefore, it is recommended to choose someone with architectural design experience and including construction services. team, such as B-STUDIO It has won many international awards, and its service scope covers architectural design, interior design, self-construction, and reconstruction of dilapidated buildings, all of which provide the most professional services.In addition to providing advice from a professional perspective, it also prevents the project from being stopped midway due to outsourcing.

 

買地自建划算嗎

There are three main stages in the process of buying land and building one yourself:

 

1 Architectural design, financial evaluation

Legal regulations in every county and city in TaiwanVolume rateDifferent from the building coverage rate, usually architects will first confirm the construction base information based on the location of the land to ensure that the land can build houses and the size of the buildable volume in accordance with Taiwan regulations, assist the homeowners in estimating the budget of self-built houses, and discuss the construction at the same time Design direction and content.

 

2 Architectural design assessment and license application process

Due to the complicated regulations in Taiwan, you do not need to own land to build a house immediately. In addition to asking an architect to confirm the floor area ratio and built-in coverage ratio of the land type, it is recommended to apply for "Land identification” Confirm the coverage area to avoid future disputes with neighbors.

 

At the same time, it is recommended to apply for a "construction line" first. Before the construction project, prepare the land ownership certificate, a copy of the ID card and other geological-related applications, and send them to the competent authority to apply for a construction license. Only then can you start building houses on your own land ~

 

3 Construction projects and decoration, acceptance and handover

After many back-and-forth discussions on the architectural design content and completion of the second phase of various administrative document applications, the construction license can be obtained and the project can be contracted to the construction factory.Entering the construction project stage, including foundation excavation, steel bar binding, formwork, grouting and other processes, the structure is gradually completed. At this stage, the architect will perform the task of supervising the construction and ensuring the quality of the project.

 

As the construction project is completed, interior decoration and major equipment such as elevators will begin. Since the requirements are fully discussed with the architect during the design stage, repeated construction or unnecessary removal will be omitted during the decoration stage. Owners save time and money.

 

After the construction project is completed and the use license is obtained, the project acceptance and housing handover stages can be entered. At this time, the homeowner can entrust an architect or a third-party impartial unit to assist in inspection and acceptance. When all deficiencies have been corrected and the construction factory delivers relevant documents and as-built drawings, handover and property rights registration can be carried out.

買地蓋房

 

How long does it take to build a self-built tunnel?

On average, it takes about 2 to 3 years to self-build and move in. It usually takes half a year to a year to apply for a construction license in the early stage. After the actual construction starts, it depends on the detailed construction needs. It usually takes about a year to complete. Including the final interior decoration and completion of the house, it usually takes about three months. When these total stages are accumulated, it usually takes 2 to 3 years to complete.

 

If buying land and building a house takes more time and money than the originally planned budget and schedule, it is usually because the construction period is extended, the architect and the construction team lack coordination and cooperation, or are not familiar with construction-related regulations, so they build their own land on their own. Choosing a company with a comprehensive professional team and experience in architectural design and actual construction will directly save you from worrying about hidden costs in the future.

 

If you are choosing a builder for the first time, it is recommended to read this article:How to choose a builder? Comparison of the advantages and disadvantages of building a dream house on your own land, self-contracting, and turnkey construction by a builder

 

Do you regret building it yourself? Find B-Studio to help you build your ideal home on your own!

Want to choose to build your own home to create your ideal home?B-Studio Specializing in water mold construction technology. People-oriented, using the architectural profession to convey the combination of beauty and environmental atmosphere, the service scope covers architectural design, interior design, self-construction, and reconstruction of dilapidated old buildings. In the past, it has assisted many residential space planning, and the team hasIntegrating architecture, interior design and space design majors,If you need to build your own plan on your own, you may wish to contact us directly B-STUDIO connect.

 

learn B-Studio Architecture and interior integrated design works

Consult the B-Studio team

 

[Extended reading]

How to choose between a newly built house built by a builder vs. a self-built house!? See which one is suitable for you

How much does it cost to build your own house? A must-read for self-built houses, from design to move-in, the cost and process of building a house are disassembled step by step

 

The appeal of building your own home is that you have complete control over the design of the space and can satisfy all your imaginations of your own home. butBuild a houseIt is not as simple as just drawing a design drawing. How does the construction process of building a house unfold? Is it cheaper to build your own house? How much does it cost to build a house? What impact do different construction methods have? This article will be written by architectural experts B-STUDIO From a professional perspective, we break down the entire process of building a house, from design planning to construction details, to gain a comprehensive understanding of the budget for building a house and build your dream home with your own hands!

 

Why choose self-build? 3 benefits of building your own house

 

  • Complete autonomy in space design: whether it is interior layout, structural arrangement, or exterior style, all details can be designed according to the owner's needs, preferences, and aesthetic tastes without having to compromise with the various limitations of existing houses.
  • Save construction costs: Compared to buying a ready-made house, building a house yourself does not require worrying about additional reconstruction and demolition costs or re-wiring issues, and can avoid excessive agency fees and developer premiums, allowing for more flexible budget control.
  • Strengthen supervision and quality assurance: During the self-built process, homeowners need to be deeply involved in decision-making and monitoring at every stage, including land assessment, design communication, and team selection. Under personal supervision, material selection, construction quality and facility configuration can be fully guaranteed.

 

Five major processes of building a house

 

 

1. Land and Financial Assessment

 

Conduct geological surveys to determine the suitability of the land, including foundation soil quality, drainage conditions, land preparation requirements, environmental risks, regulatory restrictions, etc., to ensure that the selected land is suitable for building houses. At the same time, take stock of your own financial situation, calculate the various costs of building a house, and evaluate subsequent loan options if necessary.

 

2. Architectural Design

 

Communicate with the construction team about the house building ideas, decide on the house style, exterior design and space layout, and take into account the land conditions, the living needs of family members and future expansion space. The architect or designer will submit the design plan, including structural drawings, floor plans, 3D drawings, construction drawings, equipment and material lists, etc., and discuss repeatedly until the final plan is signed off.

 

3. Apply for a Construction License

 

Entrust the construction team to apply to the local county and city government for "Construction license", submit detailed architectural design documents, and relevant authorities will review them based on land use, building structure, fire safety, environmental protection requirements, etc. to confirm that there is no risk of violation of the law. The general process takes about 10 days to 1 month, and house construction projects can only be carried out legally after obtaining a building permit.

 

4. Construction

 

constructionIt is the implementation process of transforming the design blueprint into a real building. From basic foundation engineering to main structure construction, exterior wall and roof treatment, choose appropriate construction methods and building materials. During the construction phase, close cooperation of workers is required. It is recommended to regularly visit the construction site for on-site supervision to confirm whether each stage is completed as planned, and at the same time strictly control the construction quality.

 

5. Interior decoration

 

The interior decoration stage includes internal partitions, ceiling construction, floor laying, door and window installation, interior decoration, etc. Special attention should be paid to the connection between water and electricity pipelines and interior decoration as well as waterproofing projects, especially in the kitchen and bathroom areas, to avoid water seepage problems in the later stage. The completion of the interior decoration project is not only related to the visual beauty of the house, but also directly affects the future living comfort and practicality.

 

6. Acceptance and Handover

 

It is recommended to hire a professional house inspector or conduct an acceptance inspection together with the builder to confirm whether all structures and facilities meet the design requirements and safety standards. If there are any problems, the construction party will be required to make rectifications; after acceptance, the homeowner can move in with peace of mind.

 

Example of a flowchart for building a house:

 

 

Expert in concrete construction B-STUDIO In terms of the construction process, if you have plans to build a house, it is recommended to consult an architect at the beginning. In addition to discussing the exterior design and interior layout of the house, there are many regulatory details that the public is not familiar with, such as land use restrictions and building regulations. These hidden limitations may affect the design and construction of the house.

 

It is recommended that you bring building site information, favorite building examples, style references, etc., and discuss directly with the architect so that the team can give the most appropriate advice based on their experience.

 

>>>>Consult the B-Studio team

 

The impact of different construction methods on building a house

 

The impact of choosing different construction methods on building a house is mainly reflected in structural stability, construction speed, cost and post-maintenance. Below are three common construction methods.

 

House Construction Method 1: Reinforced Concrete (RC)

 

The use of steel bars to enhance the tensile strength of concrete makes the structure more rigid and stable, has excellent fire resistance, earthquake resistance and sound insulation properties, provides high living comfort and is easy to maintain. The construction cost is the lowest, but the construction period is long. It is suitable for buildings with less than 15 floors. This construction method is widely used in Taiwanese architecture.

 

House Construction Method 2: Steel Constrution (SC)

 

Using steel as the main load-bearing structure has extremely high flexibility, light weight, more flexible structural design, simple production, fast and efficient construction, but the material cost is the most expensive. Steel frame structures will shake to a certain extent during earthquakes and typhoons, but are not easy to collapse. They are suitable for high-rise buildings and commercial and office buildings above 30 floors.

 

House Construction Method 3: Steel Reinforced Concrete (SRC)

 

SRC combines steel frames and reinforced concrete construction methods, with the two complementing each other's strengths to provide higher structural strength and stability, and enhance the sense of safety in living. It has high construction technology requirements and building costs, and is often used in medium and high-rise buildings.

 

Further reading:How much does it cost to build a skyscraper? How long will it take? Is it cheaper to build it yourself? Let you know the cost and construction cost of self-build

 

A comprehensive analysis of the cost of building a house! 4 factors that influence your decision

 

 

I often hear people ask, "Is it cheaper to build a house by yourself?" The cost of building a house is not just a simple sum of labor and material costs. Although many people believe that self-construction can reduce the cost of the builder's profit margin, the actual situation may be more complicated. Here are a few key factors that can help you assess whether building your own home makes more sense financially:

 

  • Land price:Land costs account for 50% to 70% of the total cost, which will vary depending on the geographical location, land prices, land quality, development restrictions, etc., and will also affect the difficulty and cost of subsequent infrastructure construction.
  • Structural method:Different construction methods directly affect the construction difficulty, construction period and overall cost.
  • Design style:The more sophisticated and complex the decoration style design is, the more difficult the construction and the required professional skills will be, and the cost will naturally rise.
  • Building material grade:High-quality building materials such as natural stone, imported wood and high-grade steel improve the texture and lifespan of a house, but they also significantly increase the cost.

 

How much budget should I prepare to build a house myself?

 

The total budget is preliminarily estimated based on the construction cost per ping, which includes major items such as design fees, building materials fees and construction fees. If you need financing, you must understand the relevant procedures of construction loans in advance, including interest rates, amounts and repayment terms, so as to arrange funds reasonably.

 

In addition, hidden costs such as land preparation, legal advice and construction permit application also need to be taken into consideration to avoid additional expenses affecting the plan. In order to cope with potential emergencies, it is recommended to reserve an additional 10% to 20% of emergency risk funds in the total budget.

 

Further reading:How many square feet can be built on 40 square feet of land for self-construction? Can the whole house be covered? Required costs, precautions, and cases are shared at once

 

Recommended by house builders for integrated design teams |B-STUDIO Architecture and Interior Design Team

 

B-Studio Specializing in water mold construction technology. People-oriented, using architectural expertise to convey the combination of beauty and environmental atmosphere. We integrate the majors of architecture, interior design and space design, and have won many international awards. Our service scope covers architectural design, interior design, self-construction, and reconstruction of dilapidated buildings, all of which provide the most professional services. Help you build your ideal home on your own!

 

Learn about B-Studio’s integrated architecture and interior design works

Consult the B-Studio team

 

Further reading:[Build Your Own Home] 5 major processes, cost assessment and pros and cons analysis, easy to own your dream home

How many square feet can be built on 40 square feet of land for self-construction? Can the whole house be covered? Required costs, precautions, and cases are shared at once

In modern society, owning a home of your own is the dream of many people, and building your own home is gradually becoming the choice of more and more people. However, from the initial planning to the final move-in, I believe many people will want to know how many square feet of 40-square-meter land can actually be used to build a house, whether the house should be built as a bungalow or a large house, and how much it costs to build a 40-square-foot house. And design cases will be compiled for you through this article.

 

How many square feet can be built on 40 square feet of land for self-construction? You need to first understand "floor area ratio" and "building coverage ratio"

B-Studio:日式簡約

 

When we evaluate whether to build a house on a 40-square-meter land, we first need to understand two important building parameters: floor area ratio and building coverage ratio. These two values will directly affect the total area we can build on this land and the floor area of the building. The following paragraphs will provide detailed instructions and calculation methods:

 

What does the calculation source of floor area ratio and built-in coverage ratio depend on?

Floor area ratio and built-up coverage ratio are two important indicators in building planning. Their calculation sources depend on the following three factors. These factors jointly determine the area and form of buildings that can be built on each piece of land, ensuring that during the urban development process Achieve a balance between economic, environmental and social benefits. Understanding these backgrounds will help us make more appropriate and compliant design plans before self-construction.

 

Urban Plan

The urban plan is a blueprint for urban development, planning the development direction of each city or region. Each area type will have specific floor area ratio and built-in coverage ratio requirements. These values are usually determined by the government or relevant regional planning departments based on the overall development of the city. goals to set. For example, commercial areas may have higher floor area ratios and built-up coverage ratios, while residential areas may have lower values to retain more environmentally friendly greenery and public spaces.

 

land use zoning

Divide the land according to its nature of use. Each land use type has specific floor area ratio and coverage ratio restrictions. For example, industrial land, commercial land, residential land, etc. have different building codes. These restrictions are to ensure that the land can be used rationally and to avoid over-development or waste.

 

regulations

Domestic building regulations also have specific provisions on floor area ratio and building coverage ratio. These regulations usually set relevant standards based on public safety, environmental protection, transportation needs, etc. For example, some areas may reduce the floor area ratio to meet disaster prevention needs, or limit the building coverage ratio to protect historical and cultural areas.

 

What impact do coverage ratio and floor area ratio have on buildings? How to check the construction rate and floor area ratio of a base?

 

The influence of building coverage rate

Building Coverage Ratiorefers toRatio of building projected area to building base area. A high built-up coverage ratio means that more land is covered by buildings, thus reducing the area and use scope of green spaces and public open spaces; a low built-up coverage ratio provides more outdoor space and green environment, which can improve the degree and quality of environmental beautification. The coverage ratio of low-density residential areas is 30% to 50%, that of medium-density residential areas is 50% to 70%, that of high-density residential areas is 70% to 80%, and that of commercial areas exceeds 80%.

 

The impact of floor area ratio

Floor Area Ratio (FAR)refers toThe ratio of a building's total floor area to its base area, refers to how much the total floor area of the house can be based on the base area. A high floor area ratio allows the construction of taller buildings and is suitable for densely populated areas; a low floor area ratio helps create low-density residential areas, with a floor area ratio of 30% to 50%, medium-density residential areas of 50% to 100%, and high-density residential areas of 100% to 200%, and the commercial area exceeds 200%. For example, on a piece of land of 40 square meters, if the floor area ratio is 30%, the total floor area is 12 square meters, and if the floor area ratio is 200%, the total floor area is 80 square meters.

 

Further reading:What are the building coverage ratio and floor area ratio? Understand the meaning, regulations, and formulas of building coverage rate and floor area ratio in five minutes!

 

How to check the construction ratio and floor area ratio of the site?

If you want to check the built-up coverage ratio and floor area ratio of your land, you can useNational land use zoning data queryorMinistry of Interior Real Estate Information Platform, just enter the county, city, lot and land number where the land is located. You can also directly consult the relevant units of the local government, or check the land registration book.

 

How much does it cost to build a 40 square meter house? What factors affect costs? Sharing of self-built processes

 

If calculated based on standard specifications, building materials, and construction land suitable for construction, the cost per square meter for self-construction starts from approximately 150,000 to 170,000 yuan. If the housing prices or land value in the area are high (such as Taipei, New Taipei), the cost per square meter will start from about 170,000 to 250,000 yuan, and interior decoration and architectural design costs are not included.

 

Reasons why self-construction affects costs

 

location of land

Including the shape, location, geology and other conditions of the base, as well as whether the surrounding roads are narrow and whether the access of people or equipment is inconvenient, they will also directly affect the difficulty and requirements of construction.

 

Building structural engineering methods

Common construction methods such as RC (reinforced concrete), SRC (steel reinforced concrete), SC (steel structure), the cost, difficulty, time and other factors required for each construction method will all affect the cost.

 

Materials used in construction

The cost per square meter provided above is an estimate based on the use of general building materials. If the type and quality of the required materials are different, the price will also be different, which will affect the total construction cost.

 

Take a look at the eight major processes of self-construction at once

In the process of self-construction, although each step can be completed by yourself, if you can combine the assistance of a professional team, you can save more time and effort during the construction process. From land selection, design planning, construction management to final acceptance, a professional team can help avoid potential legal issues or details and ensure that the final result is a living space that meets expectations and is safe. The following provides the content and scope of services that the professional team can assist, in order toB-studioFor example:

 

1.Consultation and proposals

2. Building and site analysis

3. Design stage

4. Project contract evaluation stage

5.Project management

6. Completion inspection

7. Quality control acceptance

8. Warranty and customer service

 

Through the above eight processes, the blueprint is gradually transformed into a dream house, so that everyone can have a comfortable and safe living environment.

 

40 square meter residential space design case sharing: Mix|Merging Chinese and Western

 

This design style is modern urban style, the case is a residential space, blending Chinese and Western styles, derived from the beauty of Chinese classical gardens, using round mirrors to refract, presenting a realm of virtual and real. The light sources in the corridor form a framed view, connecting the quiet and elegant Chinese study room with the landscape. Spanish-style mosaic floor tiles are used, and the shell chandelier and the island kitchen complement each other. Residents can sit down and make a cup of tea comfortably, enjoying the tranquility of the room alone or entertaining guests.

 

The interior layout includes living room, kitchen, dining room, study, master bedroom, dressing room, master bathroom and laundry room. The main building materials include wood grain boards, wooden floors, iron paint, gray mirrors, bright mirrors, floor tiles, black quartz, tempered gray glass, painted glass, snake curtains, accordion curtains and milky white acrylic.

 

Want to build your own but have no idea? Leave it to B-STUDIO, a team of professional craftsmen

B-studio With nearly 20 years of experience in design and space planning, and a design team of floral, landscape, and graphic design, we are able to provide customers with a full range of design services. welcomeConsult B-studioGet a professional assessment to help you create unlimited possibilities in a limited space!

How much does it cost to build a skyscraper? How long will it take? Is it cheaper to build it yourself? Let you know the cost and construction cost of self-build

I haven't seen the home I like when looking around. Either the square footage is too small or the layout is not satisfactory. I might as well consider building it on my own land and building a Tootian that I am satisfied with in every aspect. So how long and how much does it cost to build a Tootian? Would it be cheaper to build your own house? This article provides a reference for you to introduce how much construction costs per square meter and the details of self-construction costs.

 

How long does it take to build a sky-high building?

Generally speaking, it may take one to three years to build a skyscraper. The time required depends on many factors, including the size and complexity of the building, the efficiency of the construction team, weather conditions, etc. The following is roughly time process.

 

Apply for licenses and approvals

This usually takes 1 to 2 months for the architect to evaluate the land and submit all the information required for the application. Pay attention to the relevant regulations and it is recommended to find a professional architectural firm to assist.

 

design and planning stage

Discussing construction requirements and details with the architect and design team, planning, design and modifications can take anywhere from two to six months.

 

construction phase

This is the most time-consuming stage and can take anywhere from one to two years, depending on the size and complexity of the home.

 

License application and completion

After the main construction is completed, you need to apply for a usage license. It usually takes 1 to 2 months to apply for the usage license. After the license is obtained, the construction of tap water, electricity, gas and other pipelines can be carried out. Generally speaking, it will be done within 6 months of receiving the usage license. Within months, the owner will be notified to hand over the house.

 

Interior decoration:

The final stage is the interior decoration. The design requirements and the complexity of the decoration project will affect the construction time. Moreover, now is an era of great labor shortage. In the absence of construction masters, the current interior decoration time is relatively long, requiring 6 ~ The period varies from 12 months.

 

How much does it cost to build a skyscraper? Check out the breakdown of self-build costs here

Nowadays, everything is rising, and construction costs are getting higher and higher. Moreover, building a house is a complex project with many aspects. The specific cost will vary according to the needs of the homeowner. There are many key factors that affect the construction cost. Take a look here The details of the costs affected by self-construction are as follows.

 

land cost

When assessing the cost of building a building, the first thing to consider is the cost of land. The price of land will vary based on location, size and market conditions. In addition to land cost, pay attention to localVolume rateandBuilding coverage rate.

 

Building material cost

It depends on the quality of the selected building materials. The better the quality, the higher the price. In recent years, raw materials have increased, and the actual quotation still depends on the latest quotation provided by the manufacturer.

 

Design and planning costs

The cost of hiring a professional building designer to design and plan a home.

 

Labor cost

Various personnel costs required for the project.

 

other costs

Building licenses, agency fees, taxes and related construction taxes, etc., it is recommended to prepare some reserve funds for emergencies.

 

蓋一棟透天要多少錢

B-Studio’s self-built work: Qingshui Fu F House (winner of the German iF Design Award)

 

How much does the construction cost per square meter?

Judging from the current market conditions, with general specifications, the cost of self-built construction starts from about 200,000 to 400,000 per square meter. Generally, the construction cost in urban areas is often higher than that in suburbs. Building materials, Labor costs will fluctuate with time, and there are many factors that affect the price. Therefore, if you want to estimate the cost more accurately, it is recommended to discuss the evaluation with a professional team.

 

Is it cheaper to build your own house?

Overall, self-building may not necessarily be cheaper than building one built by a builder, but the advantage of self-building is that you can tailor-make the house you want, from the appearance, indoor space configuration, and choice of building materials. Or Feng Shui considerations, we can design and plan according to personal preferences and needs. The home you create with your own participation is even more extraordinary.

 

Are you worried about building your own home? Let B-Studio create the warmest home for you

 

B-Studio It is a team of professionals who are good at space integration design. They have college entrance examination architect licenses, at-risk elderly promoters and barrier-free facilities certificates. They combine the sensibility of designers and the rationality of engineers and use years of experience to focus on creating tailor-made products for customers. Make space.

 

 

Architectural works by B-Studio

B-Studio’s award-winning architectural works:Qingshui Fu, facing the exquisite red brick building of the Fujian courtyard house, the low-key and precise modern clear water molding method is used to present the spirit of modern craftsmen and form a dialogue between tradition and modernity. The home space is decorated with elegant accessories in earth tones, and combined with the flow of light and shadow and the architecture, they create a light and transparent image, interpreting the elegance and tranquility of Eastern Zen. If you want to know more, welcomecontact us.

 

Further reading:How to choose a builder? Comparison of the advantages and disadvantages of building a dream house on your own land, self-contracting, and turnkey construction by a builder

建築用地

Building land vs urban land? What are types of land A, B, C and D? Categories, uses, regulations, and shortcomings will be told to you at once!

In real estate transactions, we often see signs of construction land. What does construction land refer to? What is the difference between Jian A, Jian B, Jian B, and Jian Ding? Want to master the characteristics of the building land at once to ensure whether the land meets your building needs? This article willCompile the restrictions, regulations and shortcomings of types A, B, C and D building land, allowing you toMaster the uses and types of different types of construction land at once!

 

What is building land? What is the purpose of building land?

my country's land is divided into three major categories, namely "urban land (13%)", "non-urban land (78%)" and "national park land (9%)". Because national park land cannot be bought and sold, only urban land and non-urban land can be used as construction land and sold. The following will briefly introduce the differences between urban land and non-urban land.

 

urban land

Urban land refers to the implementationUrban Planning ActThe land within the scope is subdivided into residential areas, commercial areas, industrial areas, administrative areas and other categories.

Even if they belong to the same urban land, residential areas and commercial areas are divided into different zones, the floor area ratio and built-up coverage ratio are different. Want to know how to do your homework on land restrictions and other matters before planning a house? Welcome to refer to B-Studio’s video sharing:Small and big things about self-building-1: Why can’t I build a house if I have land? In addition to drawing and designing, architects actually have to do these things?

 

non-urban land

Non-urban land refers to land outside the scope of urban planning, and is subdivided into types A, B, C, and D construction land, as well as other types of land such askiln industry,Land types include transportation, recreation, etc. Among them, types A, B, C, and D construction land are the most common. Below, we will introduce in detail the definition and characteristics of types A, B, C, and D construction land.

 

Type A building land

Type A construction land is defined as: construction land in general agricultural areas and specific agricultural areas.

Compared with the residential land in the urban plan, the environment and living functions of the Jiajian land are less satisfactory. However, compared with other non-urban land, the land price of Jiajia land is usually lower, which can reduce the land purchase cost, and the traffic in the area is relatively poor. More convenient.

 

Type B building land

Type B construction land is defined as: construction land in rural areas, suitable for residential and low-intensity commercial use.

Building B is usually in the countryside outside urban planning. Compared with Building A, Building B has a higher population density. Most of the surrounding areas have no road planning, so the road system is narrower, and housing prices are relatively stable and will not easily rise in the future.

 

Type C building land

Category C construction land is defined as: construction land within the hillside conservation area.

The environment of Bingjian land is relatively quiet, but because the land is located in a hillside conservation area, you need to pay attention to the natural environment and wildlife regulations of the place. If you buy Bingjian land, you need to level it, do a good job in soil and water conservation, and follow relevant regulations. Only after a conservation plan can we start building a house.

 

Type D building land

Type D construction land is defined as: industrial construction land in general agricultural areas and specific agricultural areas.

Dingjian land can legally build factories and apply for a factory registration certificate, so most of it will be used as factory land. In contrast, the land lacks urbanization facilities.

 

丁種建築用地

 

Where do building land regulations come from?

According to the laws and regulations, the construction land for types A, B, C and D isNon-Urban Land Use Control Rules, different types of construction land are subject to different regulations. These regulations are designed to manage the use of land and ensure that building development complies with urban planning and development directions, while safeguarding public interests and the protection of the ecological environment. Therefore, understanding and complying with these regulations is critical to undertaking construction projects and land developments.

 

Building land restrictions

according toNon-Urban Land Use Control Rules,The built-up coverage ratio and floor area ratio of non-urban land shall not exceed the provisions in the table below, but the municipal or county (city) government may adjust it lower according to actual needs.The table below is for reference only.

 

Type of building landBuilding coverage rateVolume rate
Type A building land60%240%
Type B building land60%240%
Type C building land40%120%
Type D building land70%300%

 

Construction land disadvantages and advantages

 

Different types of construction land have different advantages and disadvantages. The following table is organized to help you understand the differences in construction land and find a suitable land type.

 

Type of building landadvantageshortcoming
Type A building land
  • Compared with other non-urban land, Jiajian’s land prices are lower, which can save land purchase costs.
  • Suitable for people who want to be closer to the city, but not in the city.
  • Compared with urban land, the environment and living functionality of Jiajia construction land are less satisfactory.
Type B building land
  • Compared with Building A, Building B has a higher population density.
  • Most of the surrounding area of the B construction land has no road planning, so the road system is relatively narrow.
  • Housing prices here are relatively stable and will not rise easily in the future.
Type C building land
  • The land environment is quiet and quiet.
  • The building coverage rate and floor area ratio are relatively low.
Type D building land
  • It is cheaper to use as factory land.
  • Lack of urbanization facilities.

 

 

Looking for B-Studio to build a house on construction land

Everyone has different needs for building a house. Before building a house, you need to find suitable land and check the different regulations of different land types to ensure your building needs. This is not an easy thing to deal with. Therefore,It is best to consult an architect firm before building a house. Let the experts assist in reviewing information and drawings from the construction management unit and the urban planning unit, and assist in the assessment of professional architectural design including land zoning, building lines, etc.Help you simplify complex things!

 

B-StudioAdhering to the people-centered design spirit, we have a professional construction and design team, and are familiar with the relevant regulations on construction land, no matter what you wantSelf-built on site, or if you have commercial space design, factory, or office building design needs, click hereConsult now, to help you build a suitable and unique house and factory!

 

Further reading:

  1. What are the building coverage ratio and floor area ratio? Understand the meaning, regulations, and formulas of building coverage rate and floor area ratio in five minutes!
  2. How to plan factory partitions? Factory office design and case studies at once

 

 

自地自建案例_青松居
B-STUDIO self-built case: Qingsongju (winner of Italian A'Design Award)
B-STUDIO AWARDS/Award-winning records for self-built residences
Taichung Fu's House
NOVUM DESIGN AWARD- SILVER
C+ Innovation China Space Design Art Competition-Excellence Award for Best Design Work
GOOD DESIGN AWARD-Shortlist review
IF DESIGN AWARDS-shortlist review
Beidou Forest House
NOVUM DESIGN AWARD- SILVER
C+ Innovation China Space Design Art Competition-Excellence Award for the Best Creative Work
GOOD DESIGN AWARD-Shortlist review
Tianyu Street
A' DESIGN AWARD - IRON
K-DESIGN AWARD- WINNER
C+ Innovation China Space Design Art Competition-Silver Award for Best Design Work
Qingsongju
A' DESIGN AWARD - IRON
K-DESIGN AWARD- WINNER
C+ Innovation China Space Design Art Competition-Silver Award for Best Creative Work
日式簡約獨棟住宅

How to choose between a newly built house built by a builder vs. a self-built house!? See which one is suitable for you

Buying a house is the largest expense for every family. If you want to build your own dream house, you need to consider many factors. The first is to choose whether to buy a house that has been built by a construction company or use your own land to build it yourself. You still don’t know. Which room type is suitable for you? It’s better to understand the advantages of each house type before buying a house and choose the dream house that best meets your family’s needs!

 

What does newly established house mean?

Newly-built houses mean that the builder has completed construction, is less than two years old, and has applied for/obtained a usage license. Some builders will select a few "real houses" when selling newly-built houses. Decorating new homes.

 

Advantages of buying a new home/What are the advantages?

 

1.Seeing is believing - Actual experience of staying in

The newly completed house has been completed, and you can check the condition of the house on the spot. Especially if there is a "real house" set up, it can better imagine the layout and configuration of the future house, natural conditions such as lighting and ventilation, and you can visit the surrounding environment of public facilities. , so that people can see it with their own eyes and actually experience the feeling of staying.

 

2.Quick house delivery- Check in immediately with one suitcase

There is no need to wait for a long time after the newly-built houses are completed. You can move in immediately after purchasing the house. In particular, many builders have launched a "buy a house and get decoration" preferential program for promotion. In addition, the builders use a large amount of decoration materials, so relatively It is easy to reduce the overall construction cost. In addition, the house price + decoration fee can be applied for a mortgage together. The burden is relatively light for first-time homebuyers and can satisfy families with urgent move-in needs.

 

Suitable for families with new homes?

  • Families with urgent housing needs
  • Prefer building public facilities-gym, swimming pool
  • Be satisfied with the house layout provided by the builder
現代簡約客廳設計

▲ Green Light 101 Design/Photo: B-STUDIO

What are the benefits of self-building a house?

 

1. Tailor-made- Build your dream house

The biggest advantage of self-building is that it is completely customizable. You don’t have to be limited by the existing choices in the market. The choice of land will vary depending on the plot ratio, built-up ratio, regulations, etc. of the land number, so you can choose the one that best meets your family’s needs. base. The design can also integrate the sunlight and Feng Shui characteristics of the site, taking indoor light and air convection into consideration.

 

2.the cost of building- Take control according to family needs

You can fully control the construction costs yourself. According to your budget, lifestyle, culture, etc., you can borrow money from the bank to purchase land and build a house. Other building materials and equipment can be planned according to personal preferences and budget, and subsequent furniture can be reserved. , interior decoration, appliances, tableware, bed sheets and other household items, legal documents and other expenses, as well as 10% to 20% in the total budget reserved as a reserve.

 

Suitable for self-built homes?

  • I always dream of having a house of my own
  • I have ideas about space and want to build my own home from scratch.
  • Focus on a space where children from 0 years old to 100-year-olds can live safely
日式簡約獨棟住宅

▲ Qingshui Fu Design/Photo: B-STUDIO

B-Studio:日式簡約

▲ Qingshui Fu Design/Photo: B-STUDIO

B-Studio He is good at human-centered design and uses architectural expertise to convey the combination of beauty and environmental atmosphere. We integrate the majors of architecture, interior design and space design, and have won many international awards. Our service scope covers architectural design, interior design, self-construction, and reconstruction of dilapidated buildings, all of which provide the most professional services. Help you build your ideal home on your own!

 

Learn about B-Studio’s integrated architecture and interior design works

Consult the B-Studio team

B-Studio清水模:日式簡約風

[2024 Architectural Design Trends] Master the 5 major elements of self-construction to create a "green" LOHAS building!

At the end of the year and the beginning of the new year, come and take a look at the architectural design trends of the new year! Architectural design is constantly changing in line with the trend – materials, technology, farewell to the haze of the epidemic, and construction is changing positively. The following are the emerging trends in self-built design. Master the 5 major elements, look forward to the development direction in the new year, and provide solutions for people who are considering self-built For your reference!

 

Green Building 

 

As climate change becomes increasingly severe, many architects are choosing to incorporate environmentally conscious choices into their designs. Green building (green building) is a building that achieves environmental friendliness and efficient use of resources in all stages of design and engineering. It maximizes energy efficiency and moderately uses natural materials to reduce the negative impact of the building on the environment. , to achieve a balance point between architecture and natural environment in design.

  • Maximize utilization efficiency and reduce waste
  • Designed with recyclable materials
  • Architecture in harmony with nature
  • Recycled green building materials-wooden or stone building materials
  • Reduce energy consumption
B-Studio清水模:日式簡約風

▲Zuyuanju Design/Photo: B-STUDIO

vertical design

 

Cities of the future will be built upward rather than outward to cope with growing urban populations. When space is at a premium, vertical design serves as a prototype for high-density contemporary urban housing. Winy Maas, the architect in charge of MVRDV, a genius in architecture, also proposed the importance of high-rise wooden buildings in the imagination of future cities! In 2022, wooden buildings will become a new choice for future buildings, providing people with a more environmentally friendly and attractive residential form.

▲ The Farmhouse Design: Studio Precht Photo:architectmagazine.com

multifunctional residence

 

In the post-COVID-19 home, the design focus has shifted to "multi-functional" design, and many architects have turned to creating multi-functional living spaces. In this type of design, the focus is on dividing open spaces, blocking noise interference, and allowing freedom and flexibility. Use each area appropriately.

  • multifunctional furniture
  • Mount cabinets to the ceiling to maximize vertical space
  • Use furniture as dividers to divide an area into multiple areas

▲ Courted House Design: Breakspear Architects Photo: Tom Ferguson

Bring nature into your home

 

In response to the epidemic, people in various countries have to stay at home to prevent the epidemic. A survey by the American Institute of Architects in 2021 showed that people’s demand for outdoor space increased from 61% in 2020 to 70%. When you want to add a touch of nature indoors, improve indoor air quality through rooftop gardens, terraces, etc., go the extra mile to renovate or design a natural-inspired exterior, bring the outdoors indoors, and thoughtfully decorate your home through balconies, terraces, and gardens. Design and decoration create a high-quality and warm life.

 

  • Use earthy and natural neutral tones
  • Rooftop transformed into garden to maximize rooftop space
  • Create an outdoor “kitchen”
  • The building uses large floor-to-ceiling windows to provide better indoor lighting and ventilation.
  • Covering a large number of green plants from buildings to landscapes

▲Photo: homestolove.com.au

Minimalism

 

Minimalism, with the aesthetics of subtraction, returns to the most basic architectural principles. In minimalist design, the use of color, texture or any other detail is simple and practical, highlighting the basic daily needs of the room, contrasting with the industrial design style, with sharp edges, clear lines, flat roofs and natural materials for the exterior. Match the wall decorations to create a new style.

  • Glass - privacy and translucency at the same time
  • Steel - suitable for more experimental or expressive designs, creating a modern and edgy space

 

▲Design:Steimle Architekten Photo:Brigida González

B-STUDIO is good at simple design. If you have any architectural or interior design needs, please feel free to contact us.:B-Studio online consultation

interior space-Avenue of Stars➦ 

construction space-Qing Shui Fu ➦

自地自建發包必須自行擔任監工

How to choose a builder? Comparison of the advantages and disadvantages of building a dream house on your own land, self-contracting, and turnkey construction by a builder

自地自建發包必須自行擔任監工

Buying a house is the life goal of many people. In order to build their ideal home, some homeowners choose to build it on their own land. However, the process of self-building is complicated. Should they build it on their own land and turn it into a turnkey package or do it on their own? How to choose a self-build builder? If you are facing the same choice, this article will tell you the advantages and disadvantages of self-contracting and builder-turnkey, and teach you how to choose a local self-builder to help you build the perfect home.

 

How to choose between self-contracting and builder-contracting? Analyze the pros and cons to find the best option

 

Before understanding the advantages and disadvantages of self-contracting and builder-contracting, let me briefly introduce you to the process of self-construction, which mainly includes architectural design, construction engineering, interior decoration, and acceptance and handover. The roles involved are:architect,interior designer, construction manufacturers, etc., overall it is a very complex and cumbersome construction process.

 

(If you want to learn more about self-construction, you can refer to:[Self-built lazy bag] Understand the advantages and 5 major processes, and easily own the My Home of your dreams)

 

Advantages and Disadvantages of Self-Built and Turnkey Contracting (Constructor Turnkey Contracting)

 

Self-build and turnkey means that the builder is responsible for the entire construction project, from land assessment, architectural design, license application, construction, supervision to acceptance and handover. In addition to saving the homeowner a lot of trouble , when calling for materials, the builder can also set the price based on quantity and get a cheaper price; the disadvantage isBecause of the additional experience and supervision of experts,The overall cost is also higher than self-contracting.There are also skills in choosing a turnkey contractor.Design beautyIf required, it is recommended that you choose to haveExperience and works,Depend onProfessional architectural design officeLed a professional construction team.

 

Comparison of the advantages and disadvantages of self-contracting and turnkey construction

 Deliver the package yourselfBuilder turnkey
advantage
  • More freedom in choosing raw materials and manufacturers
  • Lower overall cost
  • Lower burden on homeowners
  • Raw materials are cheaper based on quantity
  • The builder is responsible for the construction results
shortcoming
  • Homeowners bear greater burden
  • You are responsible for your own construction results
  • Overall cost is higher
  • The manufacturer selection needs to cooperate with the builder

 

In summary, the threshold for self-contracting is high. If the homeowner does not have an engineering background, it is not recommended to choose self-contracting to avoid risks such as project delays, poor construction, or even failure to meet regulatory standards, which will incur more costs.

 

How to choose a local self-builder? 3 keys to grasp

 

與自地自建建商討論建築設計

 

After understanding the advantages and disadvantages of self-contracting and turnkey construction by builders, I will introduce you to the method of selecting local self-builders, which mainly includes the following three keys:

 

  1. Whether the quotation is rigorous: First, observe whether the quotation is detailed enough. In addition to the construction manufacturer, material brand, grade, quantity and other information, it is best to list the project details in full.
  2. Engineering meeting: During the meeting, you can ask the manufacturer to explain the construction process in detail to observe the professionalism of the manufacturer.
  3. Whether they value your needs: High-quality manufacturers will think from the customer's perspective. No matter what questions you ask, they can fully discuss and find the best solution.

 

Recommended self-build builders|B-Studio creates your ideal home

 

"People-oriented, using architectural expertise to convey beauty and environmental atmosphere" isB-StudioPersisting in architecture, the team integrates architecture, interior design and space design majors and is good at creating dream home spaces. It has won many international awards and can help you build your ideal home on your own!

 

If you have any questions or needs related to architecture and design, please feel free toConsult the B-Studio teamorLearn more about B-Studio’s integrated architecture and interior design works

 