What are the construction steps for imitation water mold paint?
The imitation water molding method can give the wall a texture like that of water molding. It saves the cost of 80%~85% compared with water molding. It only takes 5 to 7 working days. The addition of resin protects the wall from getting stuck and stains, and the gloss can be maintained. Ten years later, you can also choose "templates" to create wall textures.
5 construction steps:
1. Before construction|Use a laser level to correct the vertical level of the wall
2. Drilling|Smooth the base surface, repair with cement and soil, and drill holes with an electric drill
3. Carry out soil restoration|Repairing round holes with cement and soil
4. Smooth|Grind finely with sandpaper
5. Coloring|Use fine cement for coloring, sponge embossing and apply 3 to 4 times to create deep and shallow layers to simulate the texture effect of water mold.
Clean water mold design recommendation | B-Studio
The clear water mold may seem pure and simple, but it contains complex and professional construction methods. Every detail is very important and must be left to a professional architect to create an ideal building.B-StudioOur architects have professional design and construction skills and are good at using simple water-molded materials to construct virtual and solid spaces. From environmental conditions, space functional requirements, appearance types and materials, interior style and texture to furniture decoration atmosphere, we can provide you with the best Comprehensive assessment and service.
For any architectural or interior design needs, please feel free to contact us:B-Studio online consultation