I haven't seen the home I like when looking around. Either the square footage is too small or the layout is not satisfactory. I might as well consider building it on my own land and building a Tootian that I am satisfied with in every aspect. So how long and how much does it cost to build a Tootian? Would it be cheaper to build your own house? This article provides a reference for you to introduce how much construction costs per square meter and the details of self-construction costs.
Table of contents
How long does it take to build a sky-high building?
Generally speaking, it may take one to three years to build a skyscraper. The time required depends on many factors, including the size and complexity of the building, the efficiency of the construction team, weather conditions, etc. The following is roughly time process.
Apply for licenses and approvals
This usually takes 1 to 2 months for the architect to evaluate the land and submit all the information required for the application. Pay attention to the relevant regulations and it is recommended to find a professional architectural firm to assist.
design and planning stage
Discussing construction requirements and details with the architect and design team, planning, design and modifications can take anywhere from two to six months.
construction phase
This is the most time-consuming stage and can take anywhere from one to two years, depending on the size and complexity of the home.
License application and completion
After the main construction is completed, you need to apply for a usage license. It usually takes 1 to 2 months to apply for the usage license. After the license is obtained, the construction of tap water, electricity, gas and other pipelines can be carried out. Generally speaking, it will be done within 6 months of receiving the usage license. Within months, the owner will be notified to hand over the house.
Interior decoration:
The final stage is the interior decoration. The design requirements and the complexity of the decoration project will affect the construction time. Moreover, now is an era of great labor shortage. In the absence of construction masters, the current interior decoration time is relatively long, requiring 6 ~ The period varies from 12 months.
How much does it cost to build a skyscraper? Check out the breakdown of self-build costs here
Nowadays, everything is rising, and construction costs are getting higher and higher. Moreover, building a house is a complex project with many aspects. The specific cost will vary according to the needs of the homeowner. There are many key factors that affect the construction cost. Take a look here The details of the costs affected by self-construction are as follows.
land cost
When assessing the cost of building a building, the first thing to consider is the cost of land. The price of land will vary based on location, size and market conditions. In addition to land cost, pay attention to localVolume rateandBuilding coverage rate.
Building material cost
It depends on the quality of the selected building materials. The better the quality, the higher the price. In recent years, raw materials have increased, and the actual quotation still depends on the latest quotation provided by the manufacturer.
Design and planning costs
The cost of hiring a professional building designer to design and plan a home.
Labor cost
Various personnel costs required for the project.
other costs
Building licenses, agency fees, taxes and related construction taxes, etc., it is recommended to prepare some reserve funds for emergencies.
How much does the construction cost per square meter?
Judging from the current market conditions, with general specifications, the cost of self-built construction starts from about 200,000 to 400,000 per square meter. Generally, the construction cost in urban areas is often higher than that in suburbs. Building materials, Labor costs will fluctuate with time, and there are many factors that affect the price. Therefore, if you want to estimate the cost more accurately, it is recommended to discuss the evaluation with a professional team.
Is it cheaper to build your own house?
Overall, self-building may not necessarily be cheaper than building one built by a builder, but the advantage of self-building is that you can tailor-make the house you want, from the appearance, indoor space configuration, and choice of building materials. Or Feng Shui considerations, we can design and plan according to personal preferences and needs. The home you create with your own participation is even more extraordinary.
Are you worried about building your own home? Let B-Studio create the warmest home for you
B-Studio It is a team of professionals who are good at space integration design. They have college entrance examination architect licenses, at-risk elderly promoters and barrier-free facilities certificates. They combine the sensibility of designers and the rationality of engineers and use years of experience to focus on creating tailor-made products for customers. Make space.
Architectural works by B-Studio
B-Studio’s award-winning architectural works:Qingshui Fu, facing the exquisite red brick building of the Fujian courtyard house, the low-key and precise modern clear water molding method is used to present the spirit of modern craftsmen and form a dialogue between tradition and modernity. The home space is decorated with elegant accessories in earth tones, and combined with the flow of light and shadow and the architecture, they create a light and transparent image, interpreting the elegance and tranquility of Eastern Zen. If you want to know more, welcomecontact us.